Hydro One Brampton
Site Terrain
The Hydro One Brampton Distribution project is a large electrical integrated protection, control and metering system developed by ESAC, completed and installed in 2002.  H1B TransformersDeveloped in tandem with a similar project for Vaughn Hydro, the management of each location saw the monetary benefits of automation.  With an ESAC system, management acquired the reliability and accuracy they needed in their hydro distribution systems.

Click to enlarge.With over 20 IEDs in the system, reliable communications are necessary.  Powered with ESAC communications, each of the IEDs successfully communicates important information such as breaker status, voltage, current, and protection status to the operator.  Screens such as the Schematic seen here inform the operator of the current system state and allow control if authorized to do so. 

Click to enlarge.Management at Hydro One Brampton uses the reports created by the ESAC Reporting system as a source of important information.  The data from the reports is used to generate appropriate operational guidelines, maintenance schedules, and load growth assessments.

In order to monitor their various locations closely, management requested a channel reaching each of the existing and future SCADA locations in Brampton.  This channel would communicate audio, video and data signals to their central offices.  Since the scalability and reliability of the system was of utmost importance, ESAC designed a self-healing fibre-ring communication system to link all such locations around the city.